Generator Interlock Kit

Use your house wiring with a generator when the electric utility power fails

National Electrical Code requires a system in place that prevents an emergency generator from feeding back into the utility line.

A generator interlock will:



B-2

Bryant Main Breaker
2 handle Bryant main breaker with the generator breaker vertically adjacent below or above the main breaker
CH-1

Cutler Hammer
1 handle horizontal throw right to left main breaker offset to the left over 2 breaker columns with a 1 1/4" space between main breaker and column breakers
CH-3

Cutler Hammer
1 handle horizontal throw right to left main breaker offset to the right over 2 breaker columns with a 1 1/2" space between main breaker and column breakers
CH-5

Cutler Hammer
1 handle vertical throw main breaker centered over 2 breaker columns with a 2 1/4" space between main breaker and breaker column
CH-6

Cutler Hammer
1 handle vertical throw main breaker centered over 2 breaker columns with a 4 1/4" space between main breaker and breaker column
CH-7

Cutler Hammer
meter / main combination with 1 handle horizontal throw main breaker centered over 2 breaker columns with a 1 1/4" space between main breaker and breaker columns
CH-8

Cutler Hammer
meter / main combination with 1 handle horizontal throw main breaker, offset left, 4 1/4" over 1 breaker column
CR-1

Challenger/Westinghouse/Thomas & Betts
meter / main with 2 handle vertical throw main breaker with a 4 1/2" space between main breaker and a single breaker column
CR-2

Challenger/Westinghouse
200A two handle horizontal throw main breaker offset 1 1/4" left of center and 1 1/4" above two breaker columns
CR-3

Challenger/Westinghouse
2 handle vertical throw main breaker centered 3 1/2" above two breaker columns
CRO-1

Crouse Hinds
2 handle horizontal throw main breaker offset 1/4" right of center and 1/2" above two breaker columns
CRO-2

Crouse Hinds
1 handle hump main breaker (on to the left) 1 7/8" above right breaker column
CRO-3

Crouse Hinds
1 handle hump main breaker, on to the left, at the top of a single breaker column
GE-1

General Electric
4 handle horizontal throw main breaker - offset right of center 5/8"- over 2 breaker columns with a 1 1/4" to 1 5/8" space between main breaker and column breakers
GE-2

General Electric
4 handle horizontal throw main breaker positioned in the middle of the breaker column
GE-3

General Electric
1 handle vertical throw main breaker centered 2 1/2" above 2 breaker columns
GE-4

General Electric
4 handle vertical throw main breaker centered over 2 columns with a 2 1/4" space between main breaker and column breakers
GE-6

General Electric
2 handle horizontal throw main breaker at the top of the right column with an 11/16" space between breaker columns
GE-7

General Electric
2 handle horizontal throw main breaker - offset right of center 5/8"- over 2 breaker columns with a 1 1/4" to 1 5/8" space between main breaker and column breakers
GE-8

General Electric
meter / main combination with two handle main breaker at the top of 1 column of breakers
GE-13

General Electric
4 handle vertical throw main breaker centered beneath 2 breaker columns with a 2 1/4" space between main breaker and column breakers
GEN-1

Murray, Siemens, GE, etc.
most any 2 handle horizontal throw main breaker opposite a 2 handle generator breaker with a 1 1/2" to 1 3/4" space between toggles when one is off and the other is on
GEN-2

Murray, Siemens, GE, etc.
most any 2 handle horizontal throw main breaker adjacent above or below a 2 handle generator breaker
GS-1

General Switch
100 amp 2 handle horizontal throw main breaker at the top of the left breaker column
ITE-1

ITE - Murray
2 handle vertical throw main breaker centered 1 1/4" above two breaker columns
M-1

Murray - ITE - Siemens
4 handle vertical throw main breaker centered over 2 breaker columns
M-2

Murray - Crouse Hinds
hump main breaker with horizontal throw on top of the right side breaker column
M-3

Murray - Crouse Hinds
hump main breaker with horizontal throw on top of the left side breaker column
M-4

Murray - Siemens
100 amp 2 handle horizontal throw main breaker at the top of the right column
M-6

Murray
200 amp 1 handle horizontal throw main breaker positioned 7/8" left of center and 1 1/4" above 2 columns of breakers
M-7

Murray
200 amp 1 handle horizontal throw main breaker positioned at the top of the right column of breakers
M-8

Arrow Hart Murray
100 amp vertical throw main breaker centered 1/2" over two breaker columns - main is on in the down position
M-9

Murray
100 amp 2 handle horizontal throw main breaker centered 1 1/4" over two breaker columns
M-11

Murray
1 handle hump main breaker, with toggle on to the left, on top of the left breaker column
M-13

Murray
200 amp 1 handle horizontal throw hump main breaker, with toggle on to the left, on top of a phantom left breaker column
M-15

Murray
1 handle hump main breaker, toggle offset to the top and on to the right, on top of the right breaker column
SD-1

Square D
4 handle horizontal throw main breaker centered over 2 breaker columns with a 2 11/16" space between main breaker and column breakers
SD-2

Square D
1 handle horizontal throw left to right main breaker centered over 2 breaker columns with a 1 1/4" space between main breaker and column breakers
SD-3

Square D
1 handle horizontal throw left to right main breaker centered over 2 breaker columns with a 1" space between main breaker and column breakers
SD-4

Square D
1 handle vertical throw main breaker centered over 2 breaker columns with a 3 to 3 1/2 inch space between main breaker and column breakers
SD-5

Square D
100 amp 2 handle horizontal throw main breaker at the top of the right column
SI-1

Siemens
meter / main combination with a 4 handle vertical throw main breaker centered over 2 breaker columns with a 2 5/8" space between main breaker and 4 column breakers
SI-2

Siemens
1 handle horizontal throw main breaker offset left over 1 breaker column
TB-1

Thomas & Betts
2 handle horizontal throw main breaker offset 1 1/4" left of center and 1 3/4" above two breaker columns